The purpose of the GVA Facilities portal is to provide information to residents, occupiers and tenants of Office 3, on the property management services provided for the benefit of all & to ensure that the interests of all parties are met.

Incoming public utilities (electricity, district heating, water, telecoms) enter the development at basement level. Metering rooms, switch rooms, transformer chambers and the like are provided in the basement. Thereafter, the utilities are distributed to the points of use by the Developer, and tenants are be required to provide and install their own telecoms.

There are plant rooms at basement level which house the following equipment:

  • Incoming district heating mains and heat exchanger
  • Heating pumps
  • Hot water storage vessels
  • Cold water storage tanks
  • Water booster sets
  • Sprinkler installation control valve for the basement sprinkler service
  • Standby diesel generator

Service shafts rise from the ground level to the roof level where plant is housed in 2 internal plant rooms and a louvred external enclosure.  The main items of plant contained at this level are:

  • An air cooled water chiller
  • Air handling plant with associated extract systems
  • Chilled water pump sets
  • Toilet extract fans
  • Sprinkler water supplies
  • Motor starter control panel
  • Electrical distribution boards